System Analysis and Design – Section 2

1. In top down analyis and design

A. each succeeding phase is more detailed than the phase before it
B. each succeeding phase is as detailed as the phase before it.
C. each succeeding phase is less detailed than the phase before it
D. aLL of the above
E. None of the above

Correct Answer: A. each succeeding phase is more detailed than the phase before it
ADVERTISEMENT

2. The _____ symbol is used in a flowchart to represent a calculation task.

A. Input
B. Output
C. Process
D. Start
E. Stop

Correct Answer: C. Process
ADVERTISEMENT

3. System prototyping helps the designer in

A. making the programmers understand how the system will function.
B. communicating to the user, quickly, how the system, when developed, will look like and get a feedback.
C. giving a demo of the software, to the system manager to whom he reports
D. both (a) and (b)
E. None of the above

Correct Answer: B. communicating to the user, quickly, how the system, when developed, will look like and get a feedback.
ADVERTISEMENT

4. Which of the following systems implementation approaches should be used if you want to run the old system and the new system at the same time for a specified period?

A. direct
B. pilot
C. parallel
D. phased
E. None of the above

Correct Answer: C. parallel
ADVERTISEMENT

5. Main characteristic of “ring”, in Data structure, is

A. First record points only to the last record
B. Last record points to the first record
C. Many records point to one record
D. Each record points to all other records
E. None of the above

Correct Answer: B. Last record points to the first record
ADVERTISEMENT

Leave A Comment?