System Analysis and Design – Section 1

16. Managers who are potential users of the MIS

A. select the optimum equipment configurations
B. evaluate alternate equipment configurations
C. describe information needs
D. All of the above
E. None of the above

Correct Answer: E. None of the above

17. Positive testing is

A. running the system with line data by the actual user
B. making sure that the new programs do in fact process certain transactions according to Specifications
C. is checking the logic of one or more programs in the candidate system
D. testing changes made in an existing or a new program
E. None of the above

Correct Answer: B. making sure that the new programs do in fact process certain transactions according to Specifications

18. Data Definition Language (DDL)

A. describes how data are structured in the data base
B. specifies for the DBMS what is required; the techniques used to process data
C. determine how data must be structured to produce the user’s view
D. All of the above

Correct Answer: A. describes how data are structured in the data base

19. In phase 1 of the system development life cycle, which of the following aspects are usually analyzed?

A. outputs
B. input (transactions)
C. controls
D. All of the above
E. None of the above

Correct Answer: D. All of the above

20. During the maintenance phase

A. System requirements are established
B. System analysis is carried out
C. Programs are tested
D. All of the above
E. None of the above

Correct Answer: E. None of the above

Leave A Comment?

4 × five =